01-10-2007, 09:09 PM
I will start out with last night just to start the record, but admit that I was not present at the meeting tonight. Somebody else can write what was done tonight.
The rack for the 1/3 scale VEX field was completed. The last 2 legs of the rack were added and the spider legs attached to each other and hung from the frame of the rack. Rings with a 10" diameter were cut from cardboard to give the VEX team tubes to practice with. The high school VEX team worked on their robots and middle schoolers were asked to begin building VEX robots to practice with.
Machining of the new gearboxes was started. The goal for completing the prototype drive system is Friday.
More ideas were thrown out for the robot design and the current design was further refined.
Cords were soldered to the top of our new batteries.
Programming ended their meeting early. Annie O's robot controller was disconnected. Annie's camera wouldn't function and the camera code for Black Widow could not be found.
The rack for the 1/3 scale VEX field was completed. The last 2 legs of the rack were added and the spider legs attached to each other and hung from the frame of the rack. Rings with a 10" diameter were cut from cardboard to give the VEX team tubes to practice with. The high school VEX team worked on their robots and middle schoolers were asked to begin building VEX robots to practice with.
Machining of the new gearboxes was started. The goal for completing the prototype drive system is Friday.
More ideas were thrown out for the robot design and the current design was further refined.
Cords were soldered to the top of our new batteries.
Programming ended their meeting early. Annie O's robot controller was disconnected. Annie's camera wouldn't function and the camera code for Black Widow could not be found.