01-31-2007, 07:38 PM
Tonight part of the electrical panel was put together, David fixed the paint on the robot and repainted part of the robot, and Kyle worked on welding pieces of the elevator. Andy worked on programming his Excel spreadsheet for scouting.
Mr. Frank brought in the metal frame for his arm, welded and painted.
The cardboard rings for the VEX field were trimmed so that they no longer touched the ground on the bottom rung of the rack.
Mr. Frank brought in the metal frame for his arm, welded and painted.
The cardboard rings for the VEX field were trimmed so that they no longer touched the ground on the bottom rung of the rack.